| Experience |
| Capps Electronics | Ventura, CA |
| Construction Lineman, Installer | July, 2010 - June, 2003 |
- Installation of Off-Air Antennas, CATV drops and Home Satellite Systems.
-
Construction and Certification of (not limited to) Broadcast Communications; RF, Infer-red and Microwave systems. Obtaining required Permits and meeting or exceeding, Local and NEC Building Codes.
-
Consulted in Design, Participated in the Construction of, Maintained and Operated 3 of our own 870mhz CATV Systems. Head-ends, distribution cabling and amplifers, totaling aporx. 70 miles. Conforming to FCC, DOT and NEC Guide Lines, Codes and Standards.
-
Locate underground cableling at the request of other utilties for maintenance, repair or up-grades, where and when digging is required. (Dig-Alert Program)
-
Generated and submitted all service and daily work reports for prompt and appropreate billing.
-
Being first to arrive and last to leave each day, made the coffee and removed the days trash.
|
| |
| Stewart Products, International Plastics, Sprectrum Design | Ventura, Camarillo, Carpinteria, CA |
| Shipping, Receiving and Warehouse Manager, Plastics Frabricator, Customer Service Representitive | June, 2003 - November, 1987 |
- *note* Theses 3 employers have been compressed for this resume. The employees and their jobs remained the same, only the ownership, name and location of the company changed.
-
Learned then Managed all aspects of the Shipping; (routing, loading, even driving our own delivery vehicle, UPS and Fed X requirements, preparing products for Commericial Carriers both interstate and international shipments. Receiving is all about the paper trail and paying attention to detail. Warehousing; organization, stocking practises, palletizing and fork lift operation.
-
Consulted with customers to design (custom displays, display boxes, equipment protection guards, table tops, ect.) then order required materials, frabricate from; acrylic, polycarbonate, styrene or other specified plastics, the item(s) to meet or exceed the customers expectations reguarding; quality of appearance, functionality and time constraints. comparable trade, Finish Cabinet Maker, all the same tools plus a few heating devices, just no nails.
-
Instituted and Managed, (to meet or exceed) the requirements of the "Hazardous Materials", "Cal Osha Safety" and local "Fire Prevention" Programs.
|
| |
| Continental Eagle Coproration | Millbrook, AL |
| Assembler, Quality Assurance Inspector | November, 1987 - March, 1987 |
- Assembled all, structrual, mechanical, electrical wiring devices and harnesses to manufacture a cotton gin.
-
Assembled, Static and Dynamically balanced the sawing, washing and drying spools, then installed and fit into place, using overhead crains, fork lifts and somethimes brute force (a bigger hammer).
-
Operationally tested each gin prior to paint, decals and shipment around the world.
|
| |
| United States Navy, USS Copeland FFG-25 | Long Beach, SanDiego, CA |
| Gas Turbine Systems Technician (mechanical) GSM1 | January, 1987 - January, 1981 |
- Preform maintenance, repair and replacement of all Main Propulsion and its Support equipment iaw the Preventative Maintenance Program.
-
Responsible for all the ships fuel, oil and water. Testing and monitoring, quality and quanitiy, coordinate for, align systems, station mointors and supervise the repleninshment of.
-
inport (duty section) Engineering Officer of the Day, underway (watch station) Engineering Officer of the Watch. Both responsible for all engineering plant operations and coordinattion of all maintenance and repair activities through out the Main Propulsion Plant, Electrical Power Plant, Auxiliary and Support Systems.
-
member of both the Engineering Casuality Control and Evaluation Team (PSM) and Damage Control Evaluation Team (Repair 5, engineering). Responsible for the proper training and qualification of watch standers and fire fighting/damage control teams.
|
| |
| Education |
| United States Naval Training Centers | Great Lakes, IL and Philadelphia, PA |
| Equivalent to; Bachelor's Degree in Mechanical Engineering | January, 1987 |
| |
| Ventura High School | Ventura, CA |
| High School Diploma | June, 1979 |
| |