| Experience |
|
| Swift Oil & Gas, Houston, TX | | 11/09 - Current |
| Project Information Management Lead |
- Have been at the BP Plant in Whiting, Indiana since December 2008. In November we changed contract companies from Alliance Group to Swift.
-
Assisted in the data migration of 500,000+ documents from the Citadon Document Management System to the Documentum Management System during a large project.
-
Documentum Administrator in charge of creating users and assigning those users to groups for security clearance in particular areas.
-
Experienced in creating training documentation for end users.
-
Assigned to the British Petroleum (BP) plant in Whiting, Indiana.
-
Oversees and assists with the handling of engineering, procurement, supplier, construction, and project documentation.
-
Responsible for maintaining a distribution matrix for projects worked on.
-
Responsible for auditing project documents for Standard Compliance during project duration.
-
Filing of electronic documents, updating of document revisions and inputting planned and offline documents into the Citadon system.
-
Assisted in a data migration from Citadon Data Management System to EMC Documentum
-
Administrator of Documentum for the project.
-
Responsible for transmitting newly received documents to the project team via Electronic distribution.
-
Responsible for the flow of Vendor Documentation between the Vendors and BP Project team.
-
Provide training on current Drawing Management Systems within both the OCC Project and the Site Documentum system.
-
Responsible for Managing drawing check-outs, check-ins, drawing number request, and concurrent Engineering to ensure changes from all subcontractors were correctly implemented into final revision.
-
Handling of copying requests for documents from printed hardcopy/email/CD-Rom/etc. for project team members.
-
Projects worked on include a 3.8 billion dollar project to refine Canadian Crude and a 5 billion dollar job to reduce carbon emissions from a power house.
-
Trained and certified in the 10 Hour OSHA safety program.
|
| |
| Alliance Group Technologies, Merrillville, IN | | 12/08-11/09 |
| PRoject Information Management Coordinator |
- Assigned to the British Petroleum (BP) plant in Whiting, Indiana.
-
Oversees and assists with the handling of engineering, procurement, supplier, construction, and project documentation.
-
Responsible for auditing project documents for Standard Compliance during project duration.
-
Filing of electronic documents, updating of document revisions and inputting planned and offline documents into the Citadon system.
-
Responsible for transmitting newly received documents to the project team via Electronic distribution.
-
Responsible for the flow of Vendor Documentation between the Vendors and BP Project team.
-
Provide training on current Drawing Management Systems within both the OCC Project and the Site Documentum system.
-
Responsible for Managing drawing check-outs, check-ins, drawing number request, and concurrent Engineering to ensure changes from all subcontractors were correctly implemented into final revision.
-
Handling of copying requests for documents from printed hardcopy/email/CD-Rom/etc. for project team members.
-
Trained and certified in the 10 Hour OSHA safety program.
|
| |
| Ambitech Engineering Corporation, Downers Grove, IL | | 10/07-11/08 |
| Engineering Software Support/IT Technician |
- Certified administrator of TSA/Advet’s Falcon Document Management System.
-
Helped end users with issues related to drawings that were in the Falcon Document Management System.
-
Performed Audits on Drawings and on users to ensure that they were using the system correctly and their documents conformed to the CAD standards.
-
Created specific environments for Ambitech clients who required special rights to access their documents.
-
Created user guides and performed training classes to enrich the end user’s knowledge of software applications.
-
Performed training on the correct use of the Document Management System.
-
Contacted the software vendors if software support was needed and followed up until issues were resolved.
-
Administrator of Engineering/IT support ticket system.
-
Responsible for maintaining computer equipment and programming Cisco VoIP phones and assigning them as needed.
-
Traveled to the Hammond, Indiana office and local Northwest Indiana refinery to perform IT and CAD software support for end users.
-
Trained and certified in the 10 Hour OSHA program.
|
| |
| CDI/LyondellBassell Corporation, Morris, IL | | 3/07-9/07 |
| Document Control Coordinator |
- Responsible for building a new document control system at the Morris, Illinois plant.
-
Assigned work orders to drafters and checked out drawings as needed, as well as pulling underground drawings for the excavation crew.
-
Performed Successful rollout of AutoCAD 2006.
-
Performed CAD standard spot checks.
-
Maintained and troubleshot Xerox 8830 plotter equipment.
-
Responsible for updating operating units with the most current P&IDs.
|
| |
| Sterling Engineering/CITGO Petroleum, Lemont, IL | | 8/02-3/07 |
| Document Control Specialist |
- Responsible for the Cyco AutoManager Workflow document management system of over 39,000 AutoCAD drawings.
-
Supported end users across the refinery with any issues that arose with the Workflow System.
-
Scanned manual drawings and placed them into the Auto Manager Workflow Drawing System and placed a paper copy into the vault room.
-
Created drawing management Archive database via MS Access.
-
Logged manual drawings into the archive database and shipped them to offsite storage site.
-
Responsible for checking drawings in and out of the Workflow system for end users.
-
Responsible for assigning the correct rights and permissions for drawings to end users.
-
Worked with outside engineering firms checking out drawings and sending them through FTP.
-
Performed CAD standard checks on drawings returned from clients.
-
Walked down drawings in question to ensure what the outside client sent back is what was on the drawings.
-
Merged drawings returned from different clients per CITGO contract agreement with clients.
-
Replaced new correct drawings into the Workflow system and replaced the old copy in the vault room.
-
Produced up to 30 drawing sets for meetings and design reviews.
-
Have 1 year of experience in piping design.
-
Maintained HP printers and Xerox 8830 and 510 plotter equipment.
-
Performed maintenance on drafting department PCs, installing service packs, patches, and software for new users.
|
| |
|
| Education |
|
| Devry University, Oak Brook, IL | | May, 2012 |
| B.S, Network and Communications Management |
|
| |
| Joliet Junior College, Joliet, IL | | May, 2004 |
| A.A.S, Network Specialist |
|
| |