Swift Oil & Gas, Houston, TX11/09 - Current
Project Information Management Lead
  • Have been at the BP Plant in Whiting, Indiana since December 2008. In November we changed contract companies from Alliance Group to Swift.
  • Assisted in the data migration of 500,000+ documents from the Citadon Document Management System to the Documentum Management System during a large project.
  • Documentum Administrator in charge of creating users and assigning those users to groups for security clearance in particular areas.
  • Experienced in creating training documentation for end users.
  • Assigned to the British Petroleum (BP) plant in Whiting, Indiana.
  • Oversees and assists with the handling of engineering, procurement, supplier, construction, and project documentation.
  • Responsible for maintaining a distribution matrix for projects worked on.
  • Responsible for auditing project documents for Standard Compliance during project duration.
  • Filing of electronic documents, updating of document revisions and inputting planned and offline documents into the Citadon system.
  • Assisted in a data migration from Citadon Data Management System to EMC Documentum
  • Administrator of Documentum for the project.
  • Responsible for transmitting newly received documents to the project team via Electronic distribution.
  • Responsible for the flow of Vendor Documentation between the Vendors and BP Project team.
  • Provide training on current Drawing Management Systems within both the OCC Project and the Site Documentum system.
  • Responsible for Managing drawing check-outs, check-ins, drawing number request, and concurrent Engineering to ensure changes from all subcontractors were correctly implemented into final revision.
  • Handling of copying requests for documents from printed hardcopy/email/CD-Rom/etc. for project team members.
  • Projects worked on include a 3.8 billion dollar project to refine Canadian Crude and a 5 billion dollar job to reduce carbon emissions from a power house.
  • Trained and certified in the 10 Hour OSHA safety program.
 
Alliance Group Technologies, Merrillville, IN12/08-11/09
PRoject Information Management Coordinator
  • Assigned to the British Petroleum (BP) plant in Whiting, Indiana.
  • Oversees and assists with the handling of engineering, procurement, supplier, construction, and project documentation.
  • Responsible for auditing project documents for Standard Compliance during project duration.
  • Filing of electronic documents, updating of document revisions and inputting planned and offline documents into the Citadon system.
  • Responsible for transmitting newly received documents to the project team via Electronic distribution.
  • Responsible for the flow of Vendor Documentation between the Vendors and BP Project team.
  • Provide training on current Drawing Management Systems within both the OCC Project and the Site Documentum system.
  • Responsible for Managing drawing check-outs, check-ins, drawing number request, and concurrent Engineering to ensure changes from all subcontractors were correctly implemented into final revision.
  • Handling of copying requests for documents from printed hardcopy/email/CD-Rom/etc. for project team members.
  • Trained and certified in the 10 Hour OSHA safety program.
 
Ambitech Engineering Corporation, Downers Grove, IL10/07-11/08
Engineering Software Support/IT Technician
  • Certified administrator of TSA/Advet’s Falcon Document Management System.
  • Helped end users with issues related to drawings that were in the Falcon Document Management System.
  • Performed Audits on Drawings and on users to ensure that they were using the system correctly and their documents conformed to the CAD standards.
  • Created specific environments for Ambitech clients who required special rights to access their documents.
  • Created user guides and performed training classes to enrich the end user’s knowledge of software applications.
  • Performed training on the correct use of the Document Management System.
  • Contacted the software vendors if software support was needed and followed up until issues were resolved.
  • Administrator of Engineering/IT support ticket system.
  • Responsible for maintaining computer equipment and programming Cisco VoIP phones and assigning them as needed.
  • Traveled to the Hammond, Indiana office and local Northwest Indiana refinery to perform IT and CAD software support for end users.
  • Trained and certified in the 10 Hour OSHA program.
 
CDI/LyondellBassell Corporation, Morris, IL3/07-9/07
Document Control Coordinator
  • Responsible for building a new document control system at the Morris, Illinois plant.
  • Assigned work orders to drafters and checked out drawings as needed, as well as pulling underground drawings for the excavation crew.
  • Performed Successful rollout of AutoCAD 2006.
  • Performed CAD standard spot checks.
  • Maintained and troubleshot Xerox 8830 plotter equipment.
  • Responsible for updating operating units with the most current P&IDs.
 
Sterling Engineering/CITGO Petroleum, Lemont, IL8/02-3/07
Document Control Specialist
  • Responsible for the Cyco AutoManager Workflow document management system of over 39,000 AutoCAD drawings.
  • Supported end users across the refinery with any issues that arose with the Workflow System.
  • Scanned manual drawings and placed them into the Auto Manager Workflow Drawing System and placed a paper copy into the vault room.
  • Created drawing management Archive database via MS Access.
  • Logged manual drawings into the archive database and shipped them to offsite storage site.
  • Responsible for checking drawings in and out of the Workflow system for end users.
  • Responsible for assigning the correct rights and permissions for drawings to end users.
  • Worked with outside engineering firms checking out drawings and sending them through FTP.
  • Performed CAD standard checks on drawings returned from clients.
  • Walked down drawings in question to ensure what the outside client sent back is what was on the drawings.
  • Merged drawings returned from different clients per CITGO contract agreement with clients.
  • Replaced new correct drawings into the Workflow system and replaced the old copy in the vault room.
  • Produced up to 30 drawing sets for meetings and design reviews.
  • Have 1 year of experience in piping design.
  • Maintained HP printers and Xerox 8830 and 510 plotter equipment.
  • Performed maintenance on drafting department PCs, installing service packs, patches, and software for new users.
 


Devry University, Oak Brook, ILMay, 2012
B.S, Network and Communications Management
  • Currently In Progress
 
Joliet Junior College, Joliet, ILMay, 2004
A.A.S, Network Specialist
  • Graduated with Honors
 

Systems Proficiencies


References Available Upon Request